Coating systems by application

See how KOPORA products work together, from substrate preparation to the final finish.

01 · EXPOSED

Exposed waterproofing system

For rooftops and other areas exposed to the weather. KPR-65 forms the waterproofing membrane, with KPR-90 topcoat protecting the surface.

03KPR-90Topcoat · Surface protection
02KPR-65Waterproofing intermediate coat
01KPR-10Primer · Substrate preparation

Concrete or mortar substrate / Apply in order, starting at step 01

02 · NON-EXPOSED

Non-exposed waterproofing system

For bathrooms, swimming pools and other areas where the membrane is covered by a separate finish. KPR-40 is a non-exposed intermediate coat and must be covered with a protective finish.

03Protective finishAs specified for the project
02KPR-40Non-exposed waterproofing intermediate coat
01KPR-10Primer · Substrate preparation

Concrete or mortar substrate / Apply in order, starting at step 01

03 · HAND-APPLIED POLYUREA

Hand-applied polyurea floor system

For car parks, factories and other floor coating applications. KPR-2800 hybrid polyurea is applied by hand, then finished with KPR-90 topcoat.

03KPR-90Topcoat · Surface protection
02KPR-2800Hand-applied polyurea intermediate coat
01KPR-10Primer · Substrate preparation

Concrete or mortar substrate / Apply in order, starting at step 01

Before application

These systems are examples to guide product selection. Determine consumption, film thickness and recoating intervals using the latest TDS and site conditions. Refer to the SDS for handling precautions.